Aerial view of Parque Eco-Industrial El Obraje: clearly defined industrial land, with the volcano in the background
I3 zoning · Legal certainty

99 years of guaranteed industrial land use*

I3 type
Land use
2014 · 2015 · 2016
Municipal ordinances
75%
Ground-floor COS
300%
Total COS
01

What I3 zoning is

I3 lets you operate with
Larger-scale manufacturing
Raw-material processing, including chemical processing
Metallurgy
Large logistics centers
Already in place at El Obraje
What I3 requires

I3 requires technical solutions to prevent pollution and risks. The industrial park already has a communal wastewater treatment plant, its own electrical substation and roads for heavy cargo.

What it isMunicipal category for high-impact industry
What forMaking, transforming or handling raw materials
What it requiresTechnical solutions against pollution and risks
WhereRural land for urban expansion or production

El Obraje is zoned I3. An industrial operation of this kind is a permitted land use.

02

Legal certainty: backed by an ordinance, not just a permit

Every industrial investment decision requires certainty about land use 10, 20 or 50 years out. El Obraje's I3 zoning is backed by a municipal ordinance for 99* years:

2014
Subdivision Resolution 2014-008-AGADMCM-F
2015
Amending ordinance that sets the location, installation and operation of the industrial and technological development zones of the Canton of Mejía.
2016
Ordinance for the installation and operation of El Obraje Industrial Park, in San Alfonso, Machachi Parish, Canton of Mejía, Province of Pichincha.
99
Years of guaranteed land use

Art. 7 of the Ordinance for the Installation and Operation of El Obraje Industrial Park (enacted May 6, 2016) grants a 99-year land-use guarantee to industries and logistics operations that meet the industrial park's urban-planning, environmental and safety conditions, counted from the date that ordinance was issued.

That is what makes this zoning a long-term investment: the company doesn't have to worry about relocating its plant because the permitted land use changed.

Free of liens

All land in the industrial park is free of liens. You receive the property with no pending legal encumbrances.

See lots with the 99-year* guarantee →Ask legal questions on WhatsApp
03

Site coverage (COS): why you can build more at El Obraje

The COS (coeficiente de ocupación del suelo) determines how many square meters you can build on your lot. At El Obraje it varies with lot size:

Lot size Ground-floor COS Total COS Floors Height
1.00 – 1.49 ha 70% 280% 4 16 m
1.50 – 9.99 ha 75% 300% 4 16 m
+10 ha 75% 300% — 25 m
A concrete example: a 4-hectare lot

On a 4-hectare lot (40,000 m²), a 75% ground-floor COS lets you build 30,000 m² on the first floor. With a 300% total COS across 4 floors, the total buildable area reaches 120,000 m².

4-hectare lot
40,000 m²
75%
Ground floor
30,000 m²
Total buildable area (4 floors)
120,000 m²

The same land yields more square meters of operations — warehouse, production, offices — without buying more land.

Calculate how much you can build on your lot →See available lots
04

The infrastructure is already built: your whole lot is for your business

Compare how much of your land is left free to produce.

AA lot outside an industrial park
Infrastructure
Part of your land goes into building services
Own electrical substation$$$
Your own water plant$$$
Your own roads$$$
Wastewater treatment plant$$$
Additional investment before producing
$$$$$
+ months of construction and permits
BA lot at El Obraje
100% for your business
The services are already built and operating since 2021
✓Drinking water plant
✓Communal wastewater treatment plant
✓Electrical switching vaults
✓Internal roads for heavy cargo
Additional investment before producing
$$$$$
Already built and operating in the industrial park. Each company treats its wastewater before discharging it, as required by municipal ordinance.
Result
All of your COS goes to production, storage and process lines.
05 · Testimonial

What companies operating here say

“The industrial park has legal certainty, with regulations that reduce occupational, industrial and environmental risks. That gives companies and investors a lot of confidence. It also has a municipal ordinance that allows it to operate for the next 99 years.”
UMCO logo, company at El Obraje Industrial ParkJesús Rojas · Production Manager, UMCO Ecuador S.A.
“Choosing land was a challenge from the start: it had to have every assurance on environmental and legal matters, so we could build an industrial plant.”
Sika logo, company at El Obraje Industrial ParkMarco Salgado · Plant Manager, Sika
Frequently asked questions

About I3 zoning and COS

It is the municipal category for high-impact industry — the land use under which an industrial plant operates legally at El Obraje.

El Obraje's I3 zoning is backed by a resolution (2014) and two municipal ordinances (2015 and 2016). Art. 7 of the industrial park's installation and operation ordinance (enacted in 2016) grants a 99-year land-use guarantee, counted from its issuance, to industries that meet the established urban-planning, environmental and safety conditions.

It is the site coverage ratio (Coeficiente de Ocupación del Suelo): the percentage of the lot you can build. At El Obraje: lots of 1 to 1.49 ha, 70% on the ground floor and 280% in total (4 floors, 16 m). Lots of 1.5 to 9.99 ha, 75% on the ground floor and 300% in total (4 floors, 16 m). Lots over 10 ha, 75% on the ground floor and 300% in total (up to 25 m high).

No. El Obraje has operated its own drinking-water plant, communal wastewater treatment plant and electrical substation since 2021. Each company treats its wastewater before discharging it, as required by municipal ordinance.

See infrastructure details →

* The 99-year term is counted from the issuance of the Ordinance for the Installation and Operation of El Obraje Industrial Park (2016) and is subject to compliance with the industrial park's urban-planning, environmental and safety conditions.

Contact us

Check your lot's building potential

An advisor can work out with you how many buildable square meters your operation gets, based on the lot size you need.